Swansea Bay Campus Navitas Revetment
Swansea University, Bay Campus, Fabian Way, SA1 8EP
Scope of the works
- Close off footpath/access and divert pedestrians
- Reptile mitigation works
- Wading bird mitigation measures
- Segregate working area on beach
- Set up access ramp for stone haul to beach
- Set up Beach working area exclusion zone Set up Beach working area exclusion zone
- Dune relocation
- Strip existing revetment
- Construct revetment
- Undertake drainage swale
- Reinstate bund and associated footpath
- Re-mobilise including reinstate car park
| Client Organisation | St Modwens |
| Contract Value | £1.2mil |
| Role | Role Principal Contractor to design and build the new coastal defences |
| Location | Swansea Bay Campus Navitas Building Revetment |